EkuPro

Decision support in short-term production control

The research objective of the AiF project "EkuPro" is the conception, development and evaluation of an app and simulation platform which supports production controllers in the objective selection of compensatory measures against delivery delays.

The research objective of the AiF project "EkuPro" is the conception, development and evaluation of an app and simulation platform which supports production controllers in the objective selection of compensatory measures against delivery delays.

Small and medium-sized enterprises (SMEs) in mechanical engineering and plant construction are often characterized by dynamic customer-supplier relationships. The resulting fluctuations in the product range to be manufactured and the production quantities represent an external complexity. In addition, internal problems such as machine breakdowns, personnel shortages and faulty materials require a high level of planning effort in order to ensure a high level of adherence to delivery dates and quality.

Due to the interdependence of production orders, machine and personnel capacity, making decisions in the context of production planning and control is a challenge for employees. In many cases the decision making is based on subjective experience and assessment of the employee.

In order to support the production controller in his work, the research project "EkuPro" of the FIR at the RWTH Aachen together with the WZL of the RWTH Aachen in tandem realistic decisions are examined. These decisions are analysed according to their cause-effect relationships, structured and transferred into a simulation model. In the form of simulated scenarios, the person in the decision situation is informed about the impact of the decision scenario with relevant key figures and thus supported in making an optimal decision. The quantitative evaluation of the situation and the simulation enable an objective and temporally extended consideration, which should improve the quality of the decision.

Branch

  • Machinery and Plant Engineering

Topic Area

  • Production Management

Research Focus

  • Produktionsregelung

FIR Navigator

  • Production Planning and Control
  • Projectinfos

    Duration
    01.04.201830.09.2020
    Funding no.
    19748 N
    Funding information

    The IGF project 19748 N of the Research Association FIR e. V. at the RWTH Aachen University is funded via the AiF within the framework of the programme for the funding of cooperative industrial research (IGF) by the Federal Ministry of Economics and Energy (BMWi) on the basis of a resolution of the German Bundestag.